2023-05-19
A project life cycle is a collection of generally sequential project whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic () for managing the project, regardless of the specific work involved.
2023-08-25 从业资格其它
TCP/IP communication protocol contains four layers. From bottom to top, the four layers are ( ) .
Which of the following scheduling methods uses more of the risk management concepts( ) .
Ethernet is the commonly used local area network communication protocol. The standard of Ethernet is ( ) .
The work that needs to be accomplished to deliver a product,service,or result with the specified features and functions is called ( ) .
Projects are a mean of achieving organizational ().
The ( ) refers to the integration of complex physical machinery with networked sensors and software. It draws together fields such as machine learning, big data, the Internet of things and machine-to-machine communication to ingest data form machines, analyze it (often in real-time), and use it to adjust operations.
Plan Quality is the process of identifying quality requirements and standards for the project and product, and documenting how the project will demonstrate compliance.( ) is a method that analyze all the costs incurred over the life of the product by investment in preventing nonconformance to requirements, appraising the product or service for conformance to requirement, and failing to meet requirements.
()is the application of planned,systematic quality activities to ensure thatthe project will employ all processes needed to meet requirements.
()seeks to build confidence that a future output or an unfinished output, will be completed in a manner that meets the specified requirements and expectations.
热门标签