C,D
Those items are often estimated in terms of resource ( ) , budget and duration.Linked by dependencies and scheduled events.
2023-08-25 从业资格其它
Cloud computing is a type of Internet-based computing that provides shared computer processingresources and data to computers and other devices on demand. Advocates claimthat cloud computing allows companies to avoid up-front infrastructure costs.Cloud computing now has few service form, but it is not including ().
( ) are thefour major activities of software configuration management.① configuration identification ② statement report ③ change control④ preparation of requirement document ⑤ configuration auditing
A schedule is commonly used in project planning and project portfolio management.( ) on a schedule may be closely related to the work breakdown structure (WBS)terminal elements, the statement of work, or a contract data requirements list.
Integration ( ) is the process of verifying that the components of a system work together as described in the program design and system design specifications.
The key benefit of( )is that it provides guidance and direction on how the project costs will be managed throughout the project.
The earned value technique is a commonly used method of performance measurement. It integrates project scope, cost, and schedule measures to help the project management team assess project performance. If a project’s Schedule Performance Index(SPI=EV/PV) value less than 1.0, it means that ( ) .
The Perform Integrated Change Control process is conducted from project inception through completion and is the ultimate responsibility of the ( ) .
The features and functions that characterize a product, service, or result in a project are called ( )。
In general, the best long-lasting approach to settling project conflict is the ( ) approach.